Construction work is officially under way at the old Alaskan Copper building. Keep checking back to our new store page to see how the changes come along.

General manager Dirk Wassink cleaned up the warehouse. It took four days of pressure washing and two days of scrubbing the floors, but look at how that industrial warehouse shines.

  

The Field Crew members Michael Greenwood and Dave Lacey take some time out of their normal work to remove debris from the paved lot and keep it safe. Look at all that metal.

   

Last but certainly not least, construction workers are stripping and building up the area that will be Second Use’s new check out area. There will be a lot more space for check-outs there than there is in the current space. Keep checking back as this structure gets finished and filled!

       

Posted 7/27/2012